City of Hubbard street resurfacing will begin Tuesday, September 15, 2026. No street parking on the following streets: Helen Dr., Meadowland Dr., Falcon Dr., Hillview Dr. and Scott St. (from Jacobs Rd. to Parish Ave.).
Menu
Quick Links
News & Alerts
Seasonal Help Wanted
The City of Hubbard is now accepting applications for seasonal / part-time leaf rakers at $14 per hour. Applications can be obtained by clicking the link below or at the Hubbard Mayor’s Office during normal business hours. Completed applications can be returned to...
E-Bike Safety – Ride Smart. Ride Legal. Ride Safe.
E-bikes are everywhere, and we know there is growing frustration and concern in our community about children riding them—especially when it comes to safety. We understand the concerns of parents, drivers, and residents. We are seeing more young people riding e-bikes...
Hubbard Community Fest Parade – Saturday!
Hubbard Community Fest kicks off this Saturday with a parade! The parade will begin at 10:00 AM at the Hubbard School Campus on Hall Ave. Parade Route: Hubbard School Campus → Hall Ave. → W. Liberty St. → Stewart Ave. Please be aware of road closures and traffic...
6:30 pm - 8:00 pm
Hubbard Administration Building, Hubbard Ohio
Key Facts About the City of Hubbard Water Pollution Control Facility
| Bar Screens | |
| Type | 1-Mechanical, 1-Manual |
| Size | 5' - 0" |
| Bar Size | 3/8" x 2" |
| Bar Spacing | 1.5" |
| Grit Collectors | |
| Type Capacity (each) | 2-Chain & Bucket |
| Motor | 8.0 million gallons/day |
| Channel Size | 1.0 HP |
| Conveyor | 2- 5' x 50' 1-12" diameter screw |
| Aeration Tank | |
| Total BOD Loading | 3,500 lbs/day |
| Aeration Volume | 2,109,890 gallons |
| Loading Rate | 12.4 #BOD/1,000 c.f. |
| Detention Time | 24 hours |
| MCRT | 28 days |
| Oxygen Requirements | 525 lbs/hr |
| Disc Assemblies | 2- 25 HP, 4- 40 HP |
| Final Clarifiers | |
| Type | 2- Suction/Scraper |
| Size | 75' diameter x 13' SWD |
| Capacity | 429,593 gallons |
| Detention Time | 9.8 hours |
| Chlorine Contact Tank | |
| Capacity | 164,912 gallons |
| Detention Time | 13 minutes @ 2.1 mgd 15 minutes @ 16.0 mgd |
| Sludge Storage Tank | |
| Type | Aerated |
| Size | 40' X 12' SWD |
| Capacity | 216,192 gallons |
| Solids Retention Time | 6.43 days |
| Loading Rate | 0.81 lbs VS/days/s.f. |
| Air Blowers | |
| Type | 2-Centrifugal |
| Air Supply (each) | 2,000 scfm @ 10 psi |
| Motor | 125 HP |
| Belt Filter Presses | |
| Type | 2-2.0 Meter |
| Capacity | 1,000 lbs dry |
| Minimum Cake Solid | 30% |
| Emergency Generator | |
| Type | Diesel Powered |
| Number | 2 |
| Capacity (each) | 400 kw |
